Mobius is currently on site at Clevedon Secondary School

Mobius is currently on site at Clevedon Secondary School, delivering specialist enabling works as part of a wider programme of structural remediation to the Tower Block.

This phase of works focuses on preparing the building for temporary structural propping and future steel installation, all carried out within a live school environment.

The scope includes:
• Controlled strip-out of multiple ceiling types
• Temporary ceiling support installations
• Preparation of concrete beams for steelwork
• Minor electrical and plumbing adjustments
• Dust protection and safe area clearance

Due to restricted access and unknown service layouts, works are being undertaken on a provisional basis, allowing further coordination once ceiling areas are opened. This early-stage intervention is critical to ensuring the safe and efficient installation of structural propping.

A highly technical package delivered with care, planning, and close attention to safety in an operational education setting.

Get in touch to find out how we can support your project with safe, efficient enabling works and structural preparation solutions.

#educationconstruction #structuralremediation #enablingworks